So I am on week three now of being stuck in the house to be here for contractors. Some of the completed projects look awesome and I know it will all be worth it in the end. But for the moment let me just vent and say grrgghhh. I am tired of the disorder. I am tired of the workers. I am tired of the mess. Last night/this morning was the worse as yesterday they ripped up the carpet and vinyl flooring in the family/kitchen/sun room which caused this disgusting thick layer of debris to cover EVERYTHING. I didn't think to cover the counters in the kitchen and now I know I will I need to clean the entire house when they are done. Last night I had to clean the thick layer covering the kitchen counters and everything that had been left on then. Then this morning I spent a long time vacuuming the sub flooring and baseboards. Now this may seem like a crazy thing to do to some but just think about it. If I didn't clean it up to my standards the new floors would have been put right down over the filth. Plus my general contractor is going to repaint the baseboards and I didn't want paint going over filth.
Oh I forgot to mention that the guys who installed the irrigation system didn't bury one of the lines into the ground, so when the lawn guys aerated the lawn they broke the line. That meant another call to the irrigation guys to come out and repair it. Yesterday afternoon and this morning I have had to listen to constant pounding as numerous small nails (remnants of the vinyl floor backer boards) are being driven into the sub flooring. The pounding is loud enough that the window breaks keep chirping because they think glass is being broken!

So one last vent and then I will go back to my positive self. Did I mention the water damage that was discovered in the sun room and basement when they ripped up the vinyl flooring? Apparently water is coming in the corners and has ruined the baseboard in the sun room. In th

e basement apartment, the door frame was installed on an angle so that water runs to the right and sits when it rains. It has now started seeping into the door frame as well. Things could always be worse, but when you are dealing with it in the moment it stinks!
But I will be positive now...the guys installing the hard wood floors were delayed a day due to another project, so our contractor has time today to replace the sub flooring and baseboard prior to the new floors going in. We also found these issues before they got even worse AND we found them prior to selling this house when they would have been found in a home inspection. Not the kind of repair you want to do last minute to make sure a deal goes through. We also can hopefully get the builder to come correct the issue in the basement thus preventing things from getting worse and preventing there being time for mold to start growing.
So here's a run down of things we've done so far so I too can remember all of the chaos:
1) Alarm System Installed
2) Foyer, first floor hallway, and family room painted
3) Tile back splash installed in kitchen
4) Tile flooring installed in laundry room
5) Irrigation system installed in front yard
To be completed:
6) Hard wood flooring in kitchen, breakfast room, sun room, and family room
7) Tile flooring in Jenna's bathroom and upstairs guest room bathroom